Old and new tool side by side: for how long?
Keeping the old tool next to the new one feels safe, then drags on for years. How to set the length of the overlap, the cut-off date and the way back.

By Jérôme Knops
Published November 26, 2026 · 4 min read

The new tool is ready, but nobody dares to switch off the old one. So everyone enters data in both "for a few weeks", and the few weeks become months. The short answer: the overlap lasts one full business cycle, not a day more, and its end is decided before it begins.
Why the overlap never ends on its own
Keeping the old tool next to the new one is a sensible reflex: if the new one has a flaw, you can carry on. The trouble is that nobody has a reason to end it. Every week someone checks "just in case", and the day you could cut over never comes, because it was never set.
Meanwhile, double entry costs time every day, and worse, the two tools start to drift apart. A change made in one forgets the other, and the question "which one is right?" comes back on every job.
Three rules to limit the overlap
1. The length: one full business cycle
A useful overlap covers at least one whole cycle of what the tool does: a month of invoicing for a plumbing and heating contractor, a full delivery round for a merchant. A shorter overlap misses the rare cases (a deposit invoice, a credit note, a month-end) that are exactly the ones that break things. A longer one teaches nothing more.
2. The cut-off date, written before you start
The date the old tool stops is set on day one, along with the name of the person who has the final say. It does not depend on a feeling ("we feel ready") but on a simple test: at the end of the cycle, do both tools show the same totals on the same jobs? If yes, you cut. If not, you fix the gap and extend by one week, just one, announced to everyone.
3. The way back, decided in advance
What really reassures people is not entering data twice, it is knowing how to go back. The old tool becomes read-only on the cut-off date: everything stays readable, nobody writes in it. And you write down in advance what would trigger a return (for instance: unable to issue an invoice the same day), so the decision is not made in a panic.
| Rule | What it replaces |
|---|---|
| One full cycle, no more | "We'll see, a few weeks" |
| A written date, one person who decides | "We'll cut when everyone is ready" |
| Read-only + written return conditions | Entering data twice to be safe |
What an overlap that drags on costs
Take the hypothesis of a plumbing and heating contractor with fifteen people, where three people in the office each re-enter twenty minutes a day into the old tool. At €35 an hour fully loaded, that is about €35 a day.
- An overlap limited to four weeks (twenty working days): about €700, once.
- An overlap that lasts all year (220 days): about €7,700, not counting the errors caused by two versions.
The first figure is the price of a transition. The second is the price of never choosing a date.
What changes with an application built for the business
When the application is built around the way you work, taking over work in progress is prepared before go-live, as described for taking over the history of an in-house tool. The first version arrives fast and serves a real cycle first, with a first version in a few weeks.
In practice, the cut-off date and the list of return conditions sit in the project plan, and the old tool stays readable, read-only, for as long as you want. See what an application built for a business covers.
What not to do
Do not cut over on go-live day with no overlap: the first real cycle is where the rare cases show up. And do not leave the overlap "open" for one reluctant user: it is better to support that person individually than to keep two tools for everyone. A review six months later will tell you whether the change held.
The overlap between two tools: the key takeaways
A useful overlap lasts one full business cycle, ends on a date written on day one, and comes with a way back decided in advance. Without that, it costs money every day and ends up creating two versions of the truth.
Prudence is not keeping both tools. It is knowing exactly when and how one of them stops.

Founder and CTO of Edenio
Jérôme Knops is the founder of Edenio, where he designs and builds custom business applications for construction, supply chain and distribution companies. He runs the scoping meetings, writes the code, and stays the person you talk to once the tool is in production.
See all their articles
Jérôme Knops
