A quote revised three times: which version did the client sign?

Worktop changed, an oven added: after three versions of a quote, nobody knows which one counts. A simple method so the question never comes up at installation.

Jérôme Knops

By Jérôme Knops

Published November 25, 2026 · 4 min read

Ask an AI

The question comes pre-written, with this article's address.

A joiner who fits kitchens sends a €14,200 quote. The client changes the worktop, then asks for an oven on top, then goes back on the extractor hood. Three versions go out, one by email, one by text message. The client signs "the quote", and on installation day nobody knows which one. The answer comes down to one rule: only one version is active at any time, and the signature is attached to that version, not to the file in general.

Why versions get mixed up

A quote that moves is nothing unusual: the client hesitates, the trade suggests options, the price follows. The mess comes from how the versions travel.

  • The file is called quote-dupont-final.pdf, then quote-dupont-final2.pdf, then quote-dupont-really-final.pdf.
  • One version goes out by email, another by text message, a third is shown on site and corrected by pen.
  • The client answers "that's fine with me" to a message that is not about the latest version.
  • Everyone keeps their own: the joiner in a folder, the office in a mailbox, the client in attachments.

The problem is invisible when the quote goes out. It shows at installation, or at invoicing, when two versions state two prices.

What it costs when versions diverge

Three things get paid for. First, the time spent finding the right version and getting it confirmed. Second, the discount granted "so as not to fall out" when the client is certain they signed the lower price. Third, the margin: a quote recalculated at version 3 without the workshop being told is built with the wrong materials, as we see in calculating the margin before the quote goes out.

The method: three steps

  1. One number, numbered versions. The quote keeps its original number, and each change becomes V1, V2, V3, with a date. Never "final".
  2. One line saying what changed. At the top of each version: "V3: hood removed, oven added, worktop in laminate". The client sees what they are signing, and you see what you agreed to.
  3. One active version, the others marked "replaced". The signature (or the "approved" note) carries the version number and the date. Older versions stay viewable, but nobody can mistake them for the one that counts.

A simple test for your team: ask three people which version of the last quote that changed was signed. If the answers differ, the method is missing.

A worked example

At a joinery business with fewer than ten people sending 120 quotes a year, one in four is changed at least twice: 30 quotes. On each, 45 minutes are lost finding the right version and getting it confirmed. At €35 an hour fully loaded, that is over €780 a year. Add a €600 discount once a year to avoid a dispute about the signed version: the total exceeds €1,300 a year, for a mess that shows on no line of the accounts.

What changes with an application built for your business

An application built for your business keeps the versions for you.

Quote tracking by status, with conversion rateSALES PIPELINEQUO-2041€18,400ACCEPTEDQUO-2042€7,250SENTQUO-2043€31,900FOLLOWED UPCONVERSION RATE41%over a rolling 12 months
  • The quote keeps one number, and each change creates a dated version, with what changed written in one line.
  • The active version is the only one that can be sent or signed. The others are marked "replaced", without anyone having to think about it.
  • The client's signature is recorded on the exact version, with the date, and the workshop sees the same version as the office.
  • Reminders follow the active version, like the follow-up of a quote left unanswered, without sending an old version by mistake.

This is the kind of need where an application built around the way you work gives more than a spreadsheet: the "one active version" rule is written into the tool, not into everyone's habits.

What not to do

Never overwrite a version that has been sent: the client may have printed the previous one. Do not delete old versions either, they are the proof of what was offered and in what order. And do not rely on a verbal agreement: an "it's fine" on the phone does not say which version.

A quote revised several times: the key takeaways

Only one version counts at any given moment, and the signature is tied to its number and date. Three steps are enough: number the versions, write what changed, mark the old ones as replaced.

The cost does not appear in the accounts: it is lost in minutes of searching, discounts granted to avoid arguments, and materials ordered on the wrong version.